Just when I thought we was done... since Harry and I couldn't motivate ourselves to paint the laundry and master bathroom we decided that we would hire our "handy"man Danny to do the painting for us and since he was here we would have him do a few other odds and ends around the house.
So our list grew and grew. Remove Metal Door in Laundry Room, Remove Door frame in Laundry Room and Replace, Paint Laundry Room, Paint Master Bathroom, Caulk Bathtub, Replace both Screen doors (Living Room & Master Bedroom), Fix Toilet in Guest bathroom (Finish from previous job), Roof Leak, Take down Fan and seal hole (above what use to be eat in kitchen), Patch Carpet in Master Bedroom (from where you took down the closets)
When he arrived this morning we altered a few things that we had requested.. instead of framing out the laundry room door once we remove the steel mesh door he suggested that we just turn it into a walkway with rounded curves like the walkway right in front of it. I loved the idea and approved it. The next change was the old fan that we wanted him to take down and seal up.. I realized the day before that we couldn't seal it up because we needed a light in that area so Harry and I went to Lowes and bought a really cool light that would match the living lights. Of course this morning I realized that it wouldn't work since the roof is slanted and the light hung and would stick out at a weird angle.. so before work this morning I had to run back to Lowes and exchange the light for something that would be flesh with the ceiling and less noticeable. The other add on was the fireplace. During the last rain storm a dark spot appeared on some of the tiles and we couldn't get it off.. so Danny suggested that we "seal" the tiles and it would make them all look the same. So we added that to his "to do" list.
So a little late I finally got into work. When I got home they had done about 1/2 of what needed to be done and planned to finish up tomorrow. The finally finished mounting the toilet in the guest bathroom which was part of their last job. They hung both screen doors and started painting the master bathroom. They started work on the new doorway in the laundry room and replaced the missing carpet in the master bathroom and they removed the fan/light in the pantry area and replace it with the new light I bought this morning. The toilet, screen doors and new light were fantastic.. I wasn't happy with the replaced carpet. Before there were two little sections of carpet that needed to be replace.. instead they decided to cut the entire corner off of the carpet and replace leaving this very long and noticeable line. Of course they realized this wasn't such a great idea and just replaced the two missing pieces on the other side but the damage was done. I wish they would have asked before going that route. Before with he night stand you wouldn't have noticed the two small pieces being replaced but with taking the whole corner out it's noticeable and I was not happy.
Tomorrow they have to fix the leak on the roof, patch the ceiling where the water came down, seal the tile on the fireplace, finish the doorway to the laundry room, paint the laundry room and finishing painting the master bathroom... let's hope he can get this all done by tomorrow.