Saturday, September 19, 2009

Remodeling - Day Twenty-One

Today we got a really late start, first we went to Home Depot and picked up a more supplies for the remodel, I think we have spent over $1500 in paint alone. After that we drove back to the rental, packed up the truck and headed out to our house, we didn't get there until 1 pm. On our way to the house we picked up Panda Express for lunch. We finally started working around 1:30pm

Our contractor was busy redoing lots of the baseboards in the TV-Room, Living and Dining Room.

Harry started to put a second coat of paint on the accent wall in the master bedroom, while I taped off the remaining ledge, and then painted the first coat. Harry painted the third coat on the accent wall and then a second coat on the two ledges and I started to tape off the inside of the closet.

Once that was done we pulled out the closet doors and I started to paint one of them while Harry started painting the inside of the closet. After I was done with one door Harry took the second door and I continued to paint the inside of the closet. We had just enough daylight left to get done with the second coat of paint on the closet doors.

So today was spent in the Master Bedroom but we got a lot of tedious work done today.

I keep saying it will be one more day.. but I have no idea when this painting hell will end.

Friday, September 18, 2009

Remodeling - Day Twenty

Today we started our day at the usual time, around 10 am. We tried to find stuff that we could put into Harry pickup truck but there wasn't much that was ready to go. Which is good because it means we have taken quite a bit of stuff to our new house and only the big furniture items are left. Once we were done packing the truck we headed out. We decided to pick up some lunch and choose Panda Express. We got to the house around 11.30 am. After lunch we unpacked the truck and started the painting. No sign of the contractor today, found out he had some family issues to take care of so today will not be his last day.. it's not planned for tomorrow.
Harry started painting the Master Bedroom accent walls in the deep red (which is going to take at least 3 coats to cover nicely). I started taping off the skylights in the Living Room. Once I was done with the taping I then started painting them. Harry came out to inform me that we were out of the "red" paint so he was done for the day in the Master Bedroom. He went outside to catch a nap while I finished painting the skylights.
Once I was done with that I moved on to the Coat Closet, I was painting it the color of the majority of the living/dining room. While Harry went and touched up some walls in the Master Bedroom and the closet doors in the Office.
By the time we were done it was getting dark and we were not going to use those heat lamps to light up any room (we already made that mistake once). So we called it a night.

We should be done with the majority of the painting tomorrow, but I won't hold my breath... Will see what happens...

Stay tuned for updates.

KOTG Microcast #8 Quest for Skype

A few weeks back Jenni and I got together with a few Guildies over Skype to discuss our favorite webseries…

skype2.jpg

Guildies who participated in the chat:

  • Belrand
  • Chris F.
  • Jeff V.
  • Nas
  • Phil aka GrrAargh
  • Lydia
  • Tynesha
  • Higlet

We hope to do one of these skype calls every month or so. If you are interested in joining us please email us at Knightsoftheguild@gmail.com

Thank you again for all your support, we do this podcast because we are fans and more importantly for the fans.

Kenny & Jenni

Other Important Links

Podcast Promo’s played during the show this week:

Thursday, September 17, 2009

Remodeling - Day Nineteen

Today Harry and I had to get up super early (well for us) since Living Spaces was going to deliver our furniture between 9.30 and 11.00 am. So we got up by 8 am, packed up the truck and left for the house. Shortly before we got on the freeway I got a call from the delivery guys just to confirm that they had the right directions to get to our house in Agua Dulce, they had already left so we were racing them to the our new place. We got to the house a little before 9.30 and a few minutes later the delivery guys from Living Spaces showed up. We had them put the furniture in the one car garage, since the remodel isn’t finished yet and didn't want it to be in the way. Once that was done, Harry and I unpacked his truck and checked on the progress of our contractor.









To our surprise he had finished framing the fireplace and it looks FANTASTIC, and it's not even stained yet. It will be absolutely gorgeous once it is stained. Danny still has to grout the master bathroom and the tiles on the fireplace.

After admiring the fireplace, we started to pull the trim tape in the Entrance and Kitchen, and there were quite a few places where some touch up work had to be done. I started with that right away. Harry started painting another coat in the master bedroom. He went pretty fast doing it by himself. After that he went into the office to pull of the tape and again there were a number of places where some touch up work was needed. Once that was accomplished I taped off the ledge in the office and we started painting the ledge with an accent color. We choose to use the main color of the bedroom as accent color for the office and it looks quite nice. Once we were done with that, we painted the doors of the closet in the accent color as well.

During that time our contractor was busy redoing the baseboards. He made some progress but still has a long way to go. I really don’t think that he will be done by tomorrow evening as he has said. I have a feeling that it is going to take him at least 1 day longer. But we’ll see about that.

After we were done painting the closet doors in the office, I finished some touch up work, while Harry went into the bedroom to pull off the tape. Again there are a number of spots that need some touch up work, but we have come to expect that now. After that I started taping off the accent wall in the bedroom and Harry started painting the trim. We have decided to paint the accent wall in the master bedroom in a very dark red and it looks AWESOME. But it will take at least 1 or 2 more coats of paint until the wall is completely colored. Once it is done it will look amazing. If I could have my way, I would have painted the entire bedroom in the accent color, but Harry said it would be too dark for him.

After we finished that wall we were tired, it had been a long day so we headed back to the rental.


Wednesday, September 16, 2009

Video Blog - Remodel Day Eighteen

Remodeling - Day Eighteen

Today Harry and I got a late start. By 11 am we were done packing up my truck and headed out to our house. While we were on the road our contractor called and asked us to pick up another box of tiles at Lowe’s. So we stopped by Lowe’s and picked up the tiles, then picked up some lunch and headed to our house. By the time we were done with lunch and unpacked the truck it was about 12:30 or so. Our contractor had started framing up the fireplace and we will have to pick out a stain for the wood that goes best together with the hardwood floors. Guess we’ll be stopping by Home Depot this evening again. Our contractor Danny still has some tile work in the Master Bathroom to do but the fireplace needs only grout. Danny picked out the grout for the fireplace, but he asked that Harry and I to pick out the grout for the master bathroom.

The first room Harry and I ended up painting today was the Office. While I taped off the trim Harry was busy painting the walls. We made pretty good progress and were finished with the first coat of paint in the office way earlier than we expected.

After the office we started with the Master Bedroom. Again I started taping off the trim, while Harry started painting the walls. Apparently our master bedroom is larger than the office as it took us a lot longer to finish the first coat of paint. We were done with the master bedroom by 6.30 pm.

After a short break we went back to the office to start with the second coat of paint. The only problem with that was that we were slowly running out of daylight and we had no light in the office. So we took our contractors construction light and started painting the office. Shortly after we had started the second coat in the office we were sweating like we were out in the direct sunlight, as that construction light gives off a ton of heat. But we knew we had to finish the second coat of paint regardless. So this time I painted the majority of the walls while Harry painted the trim.

While painting the office I got a call from Living Spaces informing us that they will be delivering the furniture that we purchased two weeks ago tomorrow between the hours of 9:30am and 11:30am. That put a wrench in our tomorrow plans. Danny asked up to pick up a few finishing things for the house and we had planned to pick them up in the morning before heading up to the house.. but when I say morning I mean around 10am. But now we had to be at the house by 9:30am which meant we would have to leave our rental by 8:30 and be up even earlier.

So we got home from a long day of painting, dropped off the dog and then turned around and went to home depot to pick up some supplies.

We finally go home around 10pm and were exhausted. And tomorrow we will be getting up early to get to the house before the delivery truck.. with our luck the truck with show up right at 9:30am.

The adventure continues....

Tuesday, September 15, 2009

Dinner and a Movie

Tonight I went out and had dinner, at Islands, with my buddy Christopher. It's been a while since we hung out so it was alot of fun catching up on our lives. After dinner we headed to AMC to catch the movie "9"

This movie looked interesting so I was happy to hear that Christopher wanted to see it as Harry didn't really have any interest. I won't go into great detail but the movie was good, not great but far from bad. I liked the story it was simple. I did wish they went into more detail about the 9 creatures, why 9 was there any significance? The machine monster were pretty sweet, especially the snake type one... very creepy stuff. This movie had some top notch actors and was animated beautifully. I look forward to watching it again.

Knights of the Guild Podcast Ep 8 pt1

Knights of the Guild Episode 8 Part 1

Show Notes:

Here it is Episode 8 part 1 of Knights of the Guild. We hope you enjoy it.

Today’s show features:

  • First up we have our monthly Vorkism.
  • Our location today is at Gamestop as we wait in line for the new expansion game The Spiers of Dragonor.
  • We talk about Season 3 and have some fan reactions to the first 2 episode that have aired.
  • We have some Guild news about the two season box set and the comic book.
  • We interview crew member Jay about his experience working on season 2 & 3.

JenniJayKenny.jpg

  • We find out what the actors and crew are up too.
  • We have a special report from Dragon*Con
  • We thank our Donors
  • Mention important links
  • Mention our recent Contest winners
  • Then we have our final words and we say goodbye.

Please send your audio or written comments to knightsoftheguild@gmail.com or you can leave your comments in the comment section of this site.

Thank you again for all your support, we do this podcast because we are fans and more importantly for the fans.

Kenny & Jenni

Other Important Links

Podcast Promo’s played during the show this week:

Monday, September 14, 2009

Remolding - Day Seventeen

Today we got up early, packed up the truck and headed to the house. Once we were done unpacking the truck we went inside house and started to clean the new floor, we did the TV room first and started to lay down brown paper over the work so nothing get's on them. We then cleaned the dining and living room floors and noticed that they still looked white and sure enough it was dust, so we cleaned them for a second time and ran our finger across them and still got dust on it. We think we need a better mop as it's going to take a few more cleaning before we finally get them looking great. We then moved onto painting. While I taped up the rest of the kitchen Harry went into the office and sanded down some spots that he had spackled yesterday. Once he was done with that he went back into the kitchen and started putting a second coat of paint on the window area in the kitchen, while I painted the walls above the ledge. After we had finished that we pulled out the fridge and painted behind the fridge as well. Now the kitchen is completely done !!!

Next on the agenda was the Entrance. After I taped off the walls Harry started painting the remaining wall the same blue accent color that we had used in the dining and living room. While he did this I was busy with some touch up work in the kitchen and started taping off the beams in the living and dining room. After Lunch Harry put a second coat of paint on the accent wall in the Entrance.

Once we were done with that we turned our attention to the 2 beams. While I painted the major surface of the 2 beams with the roller, Harry used the ladder to do the trim. But all our hard work paid off.. we finished painting the living and dining rooms, both hallways, kitchen, pantry, entrance, TV room and Guest Room.

Tomorrow we will be taking a day off, but on Wednesday we’re back painting !!


Sunday, September 13, 2009

Remodeling - Day Sixteen

First thing we did today was head to Home Depot... We had to pick up 15 more boxes of laminate hardwood flooring, 1 can of paint for the living room, paper to protect the hardwood floor, painters tape and some cleaning supplies. We spent another 1100 bucks at Home Depot. Once we were done shopping it dawned on us that we had brought my Jeep instead of Harry's pickup truck. We managed to fit all the stuff we had bought, but it was quite a tight fit. Once we got back home we put all the supplies in Harry's truck and used the remaining space to fill it up with stuff that had to go to the house as well. We got to the house around 2 pm.

Once we had finished unpacking the truck we checked on the progress that our contractor had made. They had managed to get about half of the floor in the dining room done and it was looking AWESOME. We then had a quick bite for lunch and then jumped into painting.

I first taped off the remaining walls in the Kitchen. Once that was done I then started painting the remaining walls above the ledge while Harry started painting the walls around the window in the kitchen. We really like the color and it’s already hard to imagine what the kitchen looked all white. While we were doing that our contractor made a lot of progress with the floor and had sanded down the texture wall in the office.

After finishing up with a few minor touch ups in the kitchen Harry and I went to work in the office. By the time I tapped off the one wall and windows we were only able to get a little bit of paint on the walls as night was falling and there is no light in that room. Danny and his helpers stayed a few hours late so they could finish laying down the laminate hardwood flooring. They got about 99% of it done, still have a few things to complete but it looks great. We now have a beautiful hardwood floor in the TV-Room, living and dining room.

Tomorrow Harry and I are back for more Painting!!! We are sooooo over painting..

I will keep you guys posted on the progress !!