Today in Austria our family grew. My sister-in-law, Harry's sister Greda married Bernd. I wish them all the best.Herzliche Glückwünsche
Today we headed out to our house around noon and got there around 1.30 or so. First on the agenda was the a short video for Harry's sisters upcoming wedding (tomorrow). We had come prepared with a speech, but that didn’t make the video any easier. Harry got a kick out of the screw ups, especially me trying to say Congratulations in German. Harry thinks that the ‘Making of the Wedding Video’ is way funnier than the video itself.
Once that was done we continued painting the pantry which went fairly quickly. After that I put a second coat of paint on the trim in the hallway, while Harry started to put the first coat of paint on the remaining wall in the dining room. He couldn’t finish the upper half of the wall since he had broken the long painting pole. So in order to finish the rest of the wall we will have to buy an new pole first and more paint.
Will this every end!!!!!
Today we went to Home Depot to pick up a couple of supplies. We needed 1 additional can of paint for the living / dining room, 2 cans of paint for the Office. We also picked up more paint rollers. Once we were done with that, we headed to Ralph’s since we needed some lunches and soda for the house. After Ralph’s we headed back to the rental in Reseda. We packed up Harry's pickup truck with another load and headed out to our new house.
Once there we unpacked the truck and checked how much progress our contractor had made. He started to lay out the tile in the Master Bathroom and was dealing with the texture of the one unfinished wall in the dining room.
I started taping the trim of the Pantry area. When our contractor Danny went to lunch Harry put a second coat up in the Hallway. The only thing that needs to be done in the hallway is, the trim. It needs another coat of paint. That’s was something Harry didn’t get finished before our contractor came back from lunch and started dealing with this wall again.
By that time I had made some progress taping up the trim in the pantry area (did I mention I hate taping trim) so Harry could start painting the trim. By 4.30 Harry had painted all the trim in the pantry and I had almost finished painting the shelves. We had to leave at 4.30 pm, since our current landlord wanted to show the rental to prospective customers. Tomorrow we will have to finish the first coat of pain in the pantry area, and then put a second coat of paint on the trim in the hallway and maybe we can start with unfinished wall in the dining room.
Contractor will finish the office windows today, hopes to finish the master bedroom and start to work on the fireplace tomorrow and finish the fireplace and start the master bathroom and then finish the master bath and trim in the entire house on Saturday. He will then do floors on Monday and should be done by Wednesday.. at least that is his plan.. if it happens that would be great as I really want to move in next week... guess will wait and see.
Today we went to Home Depot to pick up the Laminate Hardwood Floor. If we have measured the rooms right we need about 1.000 square feet. That would be roughly 60 boxes. When we got to Home Depot we only saw only 24 boxes. The next thing we did was to look for a sales associate. He found us another palette that had 26 boxes. So we ended up with 50 boxes. We decided that for right now that’s enough and if we really need more we can always go back and get another 10 boxes.
After that we waited for the guy to do his magic with the forklift and bring the palette down from the top shelf. Once that was accomplished I went and paid for the floor while Harry went and got the truck and drove the truck to the loading dock. The forklift guy put the hardwood floor into back of Harry's pickup truck and man that stuff is really heavy. Once we were done with Home Depot we drove back home to pick up Daisy and tie down the flooring with the cargo net that Harry had recently bought. After that we headed to the new house. All in all the hardwood floor cost us, so far, 3.500 dollars. If you add what we’re going to pay our contractor to install the hardwood floor, the entire thing will come to about 5 Grand. Luckily we don’t redo 1000 square feet every day !!!
Once we got to the house we had to unload all 50 boxes of laminate flooring, We put them in the garage for the time being until the carpet is pulled up in the living/dining and TV rooms.
After we were done with that we had to paint again. Surprise, surprise !! First we put up a second coat of paint in the Entrance. We then had to put a second coat of paint on the pillars of the Kitchen. While Harry was busy with the second coat of paint on the pillars in the kitchen, I started taping the trim in the Hallway to the guest room, bathroom and office. Once the majority of the trim had been taped off, Harry started painting the majority of the walls, while I painted the trim. We didn't have a lot of time but got quite a bit done. We're getting closer to finishing and that's good.
Today we got a early start as well. We packed up the truck and headed out. We got to the house around 10 am. We checked the paint job we did yesterday and we did a fairly good job. But we knew that we had to put a second coat on, since here and there the white still was coming through.
First we finished the two small spots in kitchen that we couldn’t finish yesterday. After that was done we started with the second coat of paint in the living room. I painted the majority of the walls and the upper trim, while Harry did the lower trim and then moved over to the kitchen walls that are exposed to the living/dining room. Around noon we were pretty much done with the second coat of paint in the living and dining room, took us about eight hours to do the first coat yesterday and only two hours to do the same thing today. Shows you how much time taping off trim and ceiling takes.. After lunch I started taping off the entrance way, while Harry finished painting the wall leading to the laundry and did some additional touch up work in the TV-Room as well.
When I was finished taping the trim/ceiling in the entrance way, Harry started painted the majority of the walls. We then turned our attention to the last 2 pillars in the kitchen.
While I taped off the trim ( btw I was hating life, taping off trim is not my cup of tea) Harry started painting the pillars. We were done around 5 pm and decided to call in the night, since we both were quite tired. Who knew painting was so physically and emotionally exhausting !!
Tomorrow we will put a second coat on everything we painted the second half of today. Then we have the living and dining room painted as far as we can, since our contractor still has to finish one of the walls first, before we can paint it.
I will keep you guys posted on the progress !!

Last Month Jenni and I were lucky enough to volunteer for The Guild booth at Blizzcon. We were also lucky enough to record some audio from our days at the con.


The audio is okay, we were using our portable recorder.
Hopefully we brought a little Blizzcon to those who could not make it and for those who did, hopefully we brought back some fun memories.
Thanks, Kenny & Jenni
Other Important Links
Podcast Promoted in this cast.
After the TV Room we put a second coat of paint on the accent walls in the living / dining room. And we have been lucky enough to only have to do two coats on most of the walls, so the accent walls should be good to go.
After we were done with the accent walls, we went to grab a bite to eat at Taco Bell. Then we were off to our new favorite store… Lowes. First we checked out some vanities/sinks, since we are looking for a new one for the Guest Bathroom. We found one or two that we both liked. Guess we’ll have to go back and look at both of them more closely when we are ready to buy. After that we went over to the Hardwood Floors. We went through all the samples they had. The ones that were nice looking and that we really liked were way too expensive and out of our price range. The Laminate Hardwood Floors that were in our price range looked way too fake for our taste. Guess we will be getting the Laminate Hardwood Floor from Home Depot that we picked out a few days ago, which cool with me since I liked it from the first moment I saw it. Not entirely sure when we will be picking up the hardwood floor, but it has to be before Wednesday as our contractor might be bringing a floor guy along.
After Lowe’s Harry and I went back to the house and I started taping some of the walls in the living room while Harry started painting. We both really like the color that we picked as main color. By 6 pm we had painted the walls in the hallway, the wall of the fire place, underneath the breakfast bar and 2 walls in the dining room. We were very happy with the progress. But we decided to keep on painting. So we painted the wall that leads to the pantry as well. Then we hit a snag. Since the kitchen will be painted in a different color than the living / dining room we weren’t quit sure were to make the transition between the colors without making it look funky. We discussed several scenarios and then came up with a solution that we think should be working best. All the pillar, that are visible from the living / dining room, will be painted in the main color of the living / dining room. The ledge on the other hand will be painted with the color that we have chosen for the kitchen. By 8.30 pm we had painted as much as we could for the day.
It was a great day of painting and I feel like we are getting closer to being done.
and bed that we had seen a few weeks prior so we planned to buy this time. A wonderful sales person Heather approached us and with her helped we managed to pick out a dining table (pictured to the left, only the table) and four dining chairs.
She also checked and that there was one more bed that we really liked in the La Mirada store so we got that.
rest of the house. We also checked out more Laminate flooring and I still went for the one I saw a few days ago and I think Harry is coming around to it too.
We talked with our contractor Danny about the way we wanted to have the tiles in the bathroom and on the fireplace. We also were talking to him about having the the carpet in the Living and Dining Room torn out and replaced with Bamboo flooring. Yesterday we found some nice Bamboo flooring at Home Depot that we liked for a really reasonable price. We haven’t made any final decision about that yet, but it looks like we will end up doing bamboo flooring in the Living and Dining Room.
Later we dealt with some touch up work in the Guest Room (Green room). While we were doing that the air quality got worse and worse. You barely could see the ridge in front of our house and Sierra Highway was nearly invisible. It pretty much looked like as if the entire Western Angeles National Forest was on fire. But I knew that wasn’t the case since Harry was keeping informed about the fire situation online. It’s great having a working Internet at our new house. The sound of Super Scoopers and helicopters flying back and forth to the fire line and dousing the flames helps to keep your mind somewhat at ease. The reason that the smoke got so thick was that we got the wind out of the south east during the afternoon hours (Acton area) where currently a lot of the active wildfire action is happening. Once the helicopters had completed a lot of their water drops, the air quality started to improve significantly. But we persisted and finished painting the nook in the Guest Bedroom the same color of the accent wall.
By the time we were done for the day, the air quality had pretty much returned to normal and no smoke billows were visible anywhere. We still didn’t want to take the chances so we packed up Harry's truck with more of my toys that we wanted to bring back to our rental in Reseda… just to be on the safe side. When we got home Harry checked the latest Fire Perimeter Map and it turns out the the north flank of the fire appears to be pretty stable and that the Northern Fire Perimeter is still south of Soledad Canyon Road. In essence that means that there are still at least between 10 and 11 miles between the Station Fire and our house. That certainly puts our minds at ease… But you never say never with fires.. could change at any moment.
Ok time for bed.. remodeling is hard work.
had gotten there via an alternate route. So Harry checked with CalTrans and got no info about road closures, so we decided to drive up to the house and see if we could make it. Turns out that the story about the road closures, that we had read online, was greatly exaggerated. We got to the house without any problems and it looked even better than the day before. There was hardly any smoke visible, most of the smoke was to the northeast (Acton area). Of course here and there you could see dark smoke rising but you could see the large fixed wing air crafts as well. Certainly makes you feel better. When we got to the house we saw that our contractor had made a lot of progress. He had started prepping the 2 holes in the walls of the office, removed the tile from the fireplace that we want to have refinished,
taken the carpet out of the bathroom and dismantled most of the built in’s in the bedroom. I was very impressed with the progress he made. While our contractor was working on other stuff Harry and I put a second coat of paint on the accent wall in Guest Room. And later we put a 3rd coat of paint on the remaining 3 walls in the Guest Room. After that was done we painted the closet doors in the color of the accent color. I have friends who ask why we continue to paint and have a contractor doing work when the house could possible burn down. But both Harry and I look at is as we have to keep positive. The house is currently in no danger and we have to move by the end of September. Positive thinking will lead to a positive outcome... But just in case it doesn’t we brought some of my toys and some of the stuff that is irreplaceable back to our rental house in Reseda. Tomorrow we will assess if we take more of the stuff back to Reseda or not. That will depend on how the wildfire is behaving.
By the time we left there was no smoke visible. Apparently the firefighters have made some progress. Additionally the wind had been blowing all afternoon long in a north east direction. That means it had been driving the fire away from our house and we are very happy about that. On the other hand there are still 11 miles between the fire and our house and the fire is still in the hills above Acton.
I guess that's it for today report.. will keep you updated on our house progress and the wildfires.
This is a special Maxi-Microcast about the Hit music video from Felicia Day ‘Do you want to date my Avatar’ Both Jenni and i worked on set during the filming of this.


Hope you enjoy it…
Please send your audio or written comments to knightsoftheguild@gmail.com or you can leave your comments in the comment section of this site.
Thank you again for all your support, we do this podcast because we are fans and more importantly for the fans.
Kenny & Jenni
Other Important Links
Wow.. what a day.. now that we got the house we want to paint and do some small construction remodels before we actually move in mid September. We planned to be on the road at 10am but I figured since we would be at the new house for the next few weeks the majority of the time that we needed to go food shopping. So instead of heading up to the house we went food shopping. After we got back and split up the groceries between our rental and our house we got back on the road. We also agreed that when we drive up we will always take a load of boxes with you.. so we loaded up Harry's truck, but before we could head north I have to go to Kim Evey's (The Guild) Producer and return the BTS camera I was using for shooting season three. Once we dropped off the camera we head up north to our new house. We got there around 1:30pm and unloaded the truck. We then had to make a trip to Lowe's (the closest hardware store) but first we wanted to teach Daisy about the doggie door that lead out to a small enclosed area for to do her business. Well she figured it out fairly quickly but our little "Houdini" also figured out how to squeeze through a gap at the top and get out which she attempted as we were leaving. So we had to leave in inside the house until we were able to block that exit.
We get to Lowe's and head to the paint department, we try and find the matching colors that we had picked up from Home Depot but couldn't find the exact colors (we had previously gone through the house and picked out colors for all the rooms). I remember that they can color match so we asked if they could match these color, they said of course and that it would take ten minutes. During this time we walked around and picked up other painting supplies like, rollers, brushes, etc...
By the time we got out of Lowe’s we were both starving and looked for something to eat. We found a Carls Jr. that was on our way home. We headed back home and were greeted by a totally overexcited Daisy. By the time we were done with our lunch and started working it was about 5 pm... where did the day go?? We pretty much knew that we wouldn’t finish the room, but we wanted to get as much as prep work done as possible. The first room we decided on painting was our TV Room. We went with a darker color called Butternut Wood but it looks more like a dark Olive Green. Both Harry and I really like it. We figure it's the TV room so a dark color would be best. There were these plastic strips that covered the cable running along the baseboard that we didn't want. So we went to pull them off. They were being held on by double stick tape and when pulled off took off some drywall as well. So I attempted to patch up some of the damage while Harry started taping off the six windows. I came to realize that my patch work wasn't going to work and that we would talk to our construction guy about fixing it so I started to paint, I wanted to a little paint on the walls to see what it looked like. I started with the Window surroundings. About and hour later we had to stop, because we ran out of daylight, we had 2 window frame painted. The day didn't go exactly as planned and we didn't get nearly as much done as I was hoping but it was still a great day working on improving OUR house. Can't get any better than that. Going back tomorrow and hoping to finish the TV Room and if were lucky our guest bathroom.
And at 5pm I was asked to run the raffle (The Guild was giving away 4 Zune MP3 players). I had Jeff (Vork) and Robin (Clara) pull the names out of Vork's deep fryer. That was a lot of fun. After that there was the cast's final signing. There was a new Cast photo/poster that a fan did for The Guild and I wanted a copy signed by everyone so I did that.
I also got a picture with each cast member because I take 1000's of photos of the cast and crew but there are so very few pictures of me on set and none with the cast members.
After the signing everyone helped break down the booth and Blizzcon 2009 was over. Jenni and I finished our podcast and she drove me to my car and I headed home.