Today Harry and I got an early start. We got up around 8 am and started packing up the truck. After that was done we headed to Home Depot to pick up more paint and a new painting poll, since Harry broke one yesterday. By 10 am we had reached our new house. The first thing we saw was a little out of the ordinary, the garage door was open. So as we got to the front door I asked Danny our contractor if he had opened the door.. he said yes..because he had brought to more worker and they wanted to start working on the hardwood floor, which is in the garage. This was unexpected news as we didn't expect the floors to go down until next week. So we quickly went inside to see the progress.
They had pulled out the carpet in the TV-Room and started laying down the Hardwood Floor. Our contractor had also made some progress in the Office and the Master Bedroom with re-texturing the wall and he had made substantial progress re-tiling the fireplace.
After checking out all the new construction work, Harry and I started putting up a second coat of paint in the Pantry. Once that was done we started painting the kitchen. When we opened the paint can I wasn’t quite sure about the color. This is the color that Harry wanted on the walls. So we put a little of paint on one of the kitchen walls. I looked at it from several different angels and still wasn’t quite sure if I liked the color or not, neither was Harry. When the color finally started to dry we were happy with it. But it's defiantly not your typical kitchen color.
For lunch we ordered pizza from a local pizzeria and expected that what you usually get in LA. There were 2 surprised with that. First one pizza was about 25 bucks and the second surprise was the size of the pizza. That thing was huge. All five of us barely finished one pizza and we had ordered two, so there are plenty of leftovers.
After Lunch Harry and I finished up painting the first coat on the kitchen walls between the counter top and the ledge. Once that was done, we pulled the tape off the pantry and inspected the quality of our paint job. There were a few places where we had to do touch up work. Once that was accomplished we checked the paint job in the kitchen as it was already dry, so we started putting up a second coat of paint. While we were doing that Danny, our contractor started ripping out the tile in the Entrance. By the time Harry and I were finished with the second coat of paint in the kitchen our contractor had almost completed laying down the floor in the Entrance.
After the the contractor had left we pull tape off in the kitchen where we no longer needed it. Not quite sure what happened, but we had to do quite a bit of touch up work. After that we finished the final wall in the dining room (at least the first coat).
15 days of painting and not an end in sight.