When our contractor Danny started he had brought this tiny computer with him to check his email and such and since the mini's came out I have wanted one. I don't have a smart phone and don't plan on getting one so I wanted something to check my email when I'm away from home. I mentioned this in passing and today Fedex showed up with a package. Of course when I saw the box I knew what it was. Harry had told me that my birthday present would be a little late this year and the package was addressed to Harry so I knew this was my Birthday gift. Harry got me a Dell Inspiron mini. It runs on Windows XP which I love and he upgraded a few of the features. I can't wait to use it.
Tuesday, September 29, 2009
An Unexpected Surprise
When our contractor Danny started he had brought this tiny computer with him to check his email and such and since the mini's came out I have wanted one. I don't have a smart phone and don't plan on getting one so I wanted something to check my email when I'm away from home. I mentioned this in passing and today Fedex showed up with a package. Of course when I saw the box I knew what it was. Harry had told me that my birthday present would be a little late this year and the package was addressed to Harry so I knew this was my Birthday gift. Harry got me a Dell Inspiron mini. It runs on Windows XP which I love and he upgraded a few of the features. I can't wait to use it.
Remodeling - Day Twenty-Eight
Around 10 am or so our contractor Danny showed up and started dismantling the Guest Bathroom and a few cabinets in the kitchen over the island. While that was going on Harry finished with the door to the
Master Bedroom and put that door back in place. The next door he tackled was the door to the Master Bathroom. He took that door down, removed the hinges and spray painted them in a metallic silver color. Once that was done he put 2 coats of white on each side of the door. Once both sides were dry he replaced the doorknob and put the bathroom door back into place. While he did this I put a third coat of stain on the mantel as both Harry and I wanted it to be darker then the floors.
After our contractor had left for today, Harry and I went shopping at Lowe’s. We were shopping for sconces for the Entrance and Hallway. We also picked up a new light for the guest bathroom as well as a vanity (sink, facet and cabinet) for the Guest Bathroom. The vanity we had in mind was one with glass vessel sink. Although that vanity looks great… the huge price tag of about 500 bucks was a little downer. We then looked at a number of different vanities. In the end we had to choose between the glass vessel vanity and a vanity that cost about half as much but still looked cool. The price wasn’t the only decision factor, as the glass vessel vanity just didn’t go together with the rest of the house, since it is a little too modern for us. So we went with the other vanity. We also picked up some tile flooring for the guest bathroom.. we looked a few options but finally went with the same tile we did in the master bath. We just really like that tile and it feels great on the bare feet.
Shopping is so much fun but man it adds up quickly.
Monday, September 28, 2009
Remodeling - Day Twenty-Seven
To make a long story short we finally figured out a configuration for the desks that works fairly well in the room. Now it looks like we are working in cubicles. But for the most part it works.
After we had decided configuration of the desks we brought all the boxes with our electronic and computer stuff in and started setting up the office. Harry's iMac was setup in no time at all. Then we went on the search for several cables and power cords. Once we were done with that we setup the Router and in no time at all we could go online. While I was checking my emails Harry used the time to give his Mac a good cleaning as that computer was pretty dirty.
The Internet we get up here is free, since the Internet Tower is on our property and we pay for the electricity to run it. That said… the Internet isn’t quite that what we are used to. As long as you only intend to read emails and surf the web, you’re fine. If you want to watch streaming videos, your best bet is to let the entire video load and watch it after it has loaded, otherwise you’re really getting frustrated. We checked the speed of the internet… and it starts out with a decent speed but isn’t able to maintain that speed. Depending on how much money that tower takes in electricity it might be worth a consideration getting a decent satellite Internet solution. Guess we will have to look into that in more detail.
KOTG Microcast 9 Quest for Cosplay
KOTG Microcast #9 Quest for Cosplay

We have a very special Microcast this week. A few weeks back during Dragon Con a photo was floating around cyberspace showing fans dressed up as The Guild character Avatar outfits. I thought it would be fun to chat with them and see how they pulled this off so quickly, among other things. So Jenni and I sat down with them over skype and had a fun conversation.
We would like to Thank David (Bladezz far left), CJ (Vork), James (Zaboo), Lisa (Codex), Daniella (Dancer), Rogue (Bladezz far right), and Caitlin (Bladezz Groupie) for taking the time and chatting with Knights of the Guild. Also pictured above are Sidley (Clara), Beth (Tink) who couldn’t make the chat but we Thank them too for being awesome.
Hope you guys enjoy it,
Kenny & Jenni
Other Important Links
- Knights of the Guild Feeds/Downloads http://knightsoftheguild.com
- Knights of the Guild Daily Blog http://knightsoftheguildpodcast.blogspot.com/
- Knights of the Guild Fan page on Facebook http://www.facebook.com/group
- Knights of the Guild Group on Watchtheguild.com http://community.watchtheguild.com/group
- Knights of the Guild Livestream Channel http://www.livestream.com/knightsoftheguild
- Follow us on twitter @knightsofguild
- Knights of the Guild Cafe Press Online Shop : Where you can buy KOTG T-shrits, magnets, buttons and so much more. http://www.cafepress.com/KOTG
- The Guild http://watchtheguild.com
- Geekerdome Network http://geekerdome.com
- Between the Lines Studio Podcast Network http://Betweenthelinesstudio.com
Podcast Promo’s played during the show this week:
Sunday, September 27, 2009
Remodeling - Day Twenty-Six
Once all that was accomplished, we headed out to the Rental to pick up the stuff that we wanted to give to recycling and a few more bags that would be going to Charity (Out of the Closet). So we got there and found our landlord and his wife busy cleaning the Rental. We put the remaining bags into my pickup truck and then gave the keys back to our landlord. We then ended up chatting with Bill and his wife for quite some time. They are very nice people and we’ll be inviting them to our house warming party.
After that we dropped off the stuff for Charity and then headed back to our house. On the way we stopped in Santa Clarita to go shopping at Stater Bros. I haven't shopped at a Stater Bros since I lived in Corona as they don't have them in the LA area.. it was nice to be back to one, it was always my favorite grocery store. We bought a lot, we planned on stocking up a bit since it's a 20 minute drive to here. We wound up spending just under $500, which I expected but Harry thought we were be way over. We did have two shopping carts both full to the top. After that we headed home and unloaded the food and stored it in our new kitchen. After that we had dinner and watched some TV.
Saturday, September 26, 2009
Cleaning the Rental
Today Harry and I didn’t get anything done in our new house, since we had to drive to the rental in Reseda and do some clean up. We had rented a steam cleaner at Ralphs yesterday and hoped to steam clean the office and Master Bedroom first. But when I tried in the morning, the steam cleaner just didn’t want to work. So we drove out to Reseda and exchanged the steam cleaner for a working one. Once we got to the Rental we moved the stuff that we hadn’t taken yesterday into the garage. After that was accomplished I started cleaning the laminate floors, while Harry gave the carpets a good vacuuming. Harry did a great job at prepping the carpets for the steam cleaning. After that Harry and I took turns steam cleaning room after room, when we were done the rooms looked fantastic.
After the steam cleaning we moved the stuff we no longer wanted to the curb. If everything goes according to plan that stuff should be picked up by the city on Monday or Tuesday, at least that what hasn’t been taken by people in the neighborhood. And as we were taking stuff out things were being removed from the pile. Our next door neighbors grabbed our dining table and chairs moments after we put them out there.
After we were done with that, Harry and I packed up my pick up truck with all the remaining stuff from the garage. The rest of the stuff that just didn’t want to fit in the truck went into my jeep. After that was done we drove out to our new house in Agua Dulce. Now all of our stuff has been moved. Tomorrow we will have to go back to pick up the recycling stuff and the stuff for charity and to give the keys back to our landlord.
It was a long and exhausting, but very successful day.
Friday, September 25, 2009
MOVING DAY!!!!!! (Remodeling Day - Twenty-Five)
The day started with some more packing as I couldn't get it all
So we were off.. I drove the U-Haul and Harry drove his truck. Along the way Harry stopped to
Thursday, September 24, 2009
Final Packing Day
Wednesday, September 23, 2009
Remodeling - Day Twenty-Four
Harry then moved on to taking off the door of the linen closet so he could paint it. Once the first coat was done he took the hardware outside to spray paint silver. After he did that he helped me "attempt" to put the office door back on. It took a few tries as the hinges were first on wrong, then backwards.. but we finally got it to work.
After the office door was put back up, Harry started painting the door jam of the linen closet and than put up a second coat on the door of the linen closet itself. After that it was time for lunch... we were so tired of out food eating it the past month we opted for Denny's.
After we had gotten back form lunch, I got busy with some touch up work while Harry finished the the second coat of paint on the door jam of the linen closet. I then started to put the doors of the closet in the guest room back in. And like the office doors it presented itself as a challenge but I finally got them on and looking good.
Once Harry was done with the linen closet door he moved on to the door of the guest bedroom. He removed it and painted his first coat. While that dried he took the hardware outside and spray painted it. While the first coat of paint was drying we tried to put out the screen door, as I wanted to start bringing in some of the furniture that we purchased a few weeks back. We had the hardest time with the screen door and my tempter had gotten the better of me and if you know me that doesn't happen often but I ripped the screen door from the track and broke one of the wheels. But it was still usable so all wasn't lose.
We then took Harry's truck to the garage and loaded up some of the furniture.. yes our property is that big that we drove to the garage from the back door. We loaded in the couch and as we were walking in the screen door got tangled in my feet so I tossed it aside (kind of forcefully) and sure enough it hit the side of the deck and tore a huge hole in it. So now we have to buy a new screen door for the back door. So it took about four trips back and forth before we got all the furniture in. It's finally starting to feel like our house.
After that Harry put a second coat of paint on the door of the guest bedroom, since he was running out of daylight that was going to be the last thing we did for the night.
This was a tough day.. it was my Birthday and though I got Birthday tweets, and facebook greetings and a few calls this day wasn't that great. I was super tired and not feeling great and my emotions went up and down all day long. I so didn't want to be doing this on my birthday but knew we had to do this in order for us to move in on Friday. I'd be in a crappy mood and then get a call or tweet and be happy, then something stupid would happen and my mood would change. I just think 24 days of remodeling and painting is taking it's toll on me. I can't wait for this to be done soon.
My 39th Birthday
Tuesday, September 22, 2009
Remodeling - Day Twenty-Three
First on the list was some touch up work in the guest room. Harry managed to touch up the most of the spots that needed touching up before running out of paint. Guess we should have gotten a gallon of the accent paint instead of just a quart. Going to have to buy another quart...
The next thing on the agenda was to paint the door of the office and the door jam in the same white as the baseboards. Harry started on that project while I did a ton of touch up work in the living and dining room, mostly floor boards and ceiling.
About mid day Harry and I left to pick up more painting supplies and also we wanted to get some silver door knobs at Lowe’s. While we were out we picked up lunch as well.
After lunch I continued with the touch ups work in living, dining and TV room, while Harry put a second coat on the office door and on the door jam. While he did this I went out back to spray paint the door hinges and screws silver to make them the same as the new door knobs. We didn't want to have to buy all new hinges and figured this was the best solution as both Harry and I hate the gold/brass color. And I have to say they turned out pretty nice. By the time we ran out of daylight we were had spray painted all the screws and hinges for the office door.
Once we were home and ate some dinner we headed out to Staples to
pick up our office desks. We did some research online and found a desk that we both liked.
Today also marks the one month anniversary of the day that we got the keys to the house ... and still we haven’t moved in !!!
One of these days!!!!
Monday, September 21, 2009
Remodeling - Day Twenty-Two
Today started our day pretty much at the usual time. We packed up the truck and headed out around 10 am and got to the house shortly before 11 am. We just finished unpacking the truck when I got a phone call from Direct TV asking us if they could stop by earlier. Of course we said yes. Shortly after that our contractor arrived and started with the finishing touches.
While I was dealing with the guys from Direct TV, Harry started painting the inside of the closet in our office. To amuse himself he wrote a message on the inside of the closet. Once I was done dealing with the guys from Direct TV I joined me in the office and started working on some touch up work. The Direct TV guys were done quickly. They couldn’t hook up the receivers, since our TV's were still at the rental, so we will have to do it ourselves, which shouldn't be a problem.
By the time we were finished with the office our contractor let us know that he was finished as well and was ready to leave. He will most likely be back in a couple of weeks for Phase 2 of the remodel (Guest Bathroom, Kitchen and Toy Room). But before that happens Harry and I have to reassess the money situation as this phase one remodel cost us more then we had planned as we never planned to put a $6000 hardwood floor in.
After Danny had left, Harry and I and drove to Palmdale to pick up a few supplies at Home Depot. While we were out we picked up lunch as well. We got back and saw that Daisy had left her paw prints on the freshly painted windowsill. Luckily the paint was already dry when she got up there and we just wiped it clean. What is funny is her paws were on every windowsill on every window she could look out of.
After lunch I went into the living / dining room to deal with more touch up work, while Harry went into the guest room and started painting the inside of the closet in there.
So we are getting closer to finishing and it can't come soon enough.. now it's time for the time consuming little detail stuff.
Guess that's it for today.. seems like this is all I every blog about these days but to be truthful this is truly all I have been doing for the past month.
Sunday, September 20, 2009
Day of Rest... yeah right!!!!
Saturday, September 19, 2009
Remodeling - Day Twenty-One
Today we got a really late start, first we went to Home Depot and picked up a more supplies for the remodel, I think we have spent over $1500 in paint alone. After that we drove back to the rental, packed up the truck and headed out to our house, we didn't get there until 1 pm. On our way to the house we picked up Panda Express for lunch. We finally started working around 1:30pm
Our contractor was busy redoing lots of the baseboards in the TV-Room, Living and Dining Room.
Harry started to put a second coat of paint on the accent wall in the master bedroom, while I taped off the remaining ledge, and then painted the first coat. Harry painted the third coat on the accent wall and then a second coat on the two ledges and I started to tape off the inside of the closet.
Once that was done we pulled out the closet doors and I started to paint one of them while Harry started painting the inside of the closet. After I was done with one door Harry took the second door and I continued to paint the inside of the closet. We had just enough daylight left to get done with the second coat of paint on the closet doors.
So today was spent in the Master Bedroom but we got a lot of tedious work done today.
I keep saying it will be one more day.. but I have no idea when this painting hell will end.
Friday, September 18, 2009
Remodeling - Day Twenty
We should be done with the majority of the painting tomorrow, but I won't hold my breath... Will see what happens...
Stay tuned for updates.
KOTG Microcast #8 Quest for Skype
A few weeks back Jenni and I got together with a few Guildies over Skype to discuss our favorite webseries…

Guildies who participated in the chat:
- Belrand
- Chris F.
- Jeff V.
- Nas
- Phil aka GrrAargh
- Lydia
- Tynesha
- Higlet
We hope to do one of these skype calls every month or so. If you are interested in joining us please email us at Knightsoftheguild@gmail.com
Thank you again for all your support, we do this podcast because we are fans and more importantly for the fans.
Kenny & Jenni
Other Important Links
- Knights of the Guild Feeds/Downloads http://knightsoftheguild.com
- Knights of the Guild Daily Blog http://knightsoftheguildpodcast.blogspot.com/
- Knights of the Guild Fan page on Facebook http://www.facebook.com/group
- Knights of the Guild Group on Watchtheguild.com http://community.watchtheguild.com/group
- Knights of the Guild Livestream Channel http://www.livestream.com/knightsoftheguild
- Follow us on twitter @knightsofguild
- Knights of the Guild Cafe Press Online Shop : Where you can buy KOTG T-shrits, magnets, buttons and so much more. http://www.cafepress.com/KOTG
- The Guild http://watchtheguild.com
- Geekerdome Network http://geekerdome.com
- Between the Lines Studio Podcast Network http://Betweenthelinesstudio.com
Podcast Promo’s played during the show this week:
Thursday, September 17, 2009
Remodeling - Day Nineteen
Today Harry and I had to get up super early (well for us) since Living Spaces was going to deliver our furniture between 9.30 and 11.00 am. So we got up by 8 am, packed up the truck and left for the house. Shortly before we got on the freeway I got a call from the delivery guys just to confirm that they had the right directions to get to our house in Agua Dulce, they had already left so we were racing them to the our new place. We got to the house a little before 9.30 and a few minutes later the delivery guys from Living Spaces showed up. We had them put the furniture in the one car garage, since the remodel isn’t finished yet and didn't want it to be in the way. Once that was done, Harry and I unpacked his truck and checked on the progress of our contractor.
To our surprise he had finished framing the fireplace and it looks FANTASTIC, and it's not even stained yet. It will be absolutely gorgeous once it is stained. Danny still has to grout the master bathroom and the tiles on the fireplace.
After admiring the fireplace, we started to pull the trim tape in the Entrance and Kitchen, and there were quite a few places where some touch up work had to be done. I started with that right away. Harry started painting another coat in the master bedroom. He went pretty fast doing it by himself. After that he went into the office to pull of the tape and again there were a number of places where some touch up work was needed. Once that was accomplished I taped off the ledge in the office and we started painting the ledge with an accent color. We choose to use the main color of the bedroom as accent color for the office and it looks quite nice. Once we were done with that, we painted the doors of the closet in the accent color as well.
During that time our contractor was busy redoing the baseboards. He made some progress but still has a long way to go. I really don’t think that he will be done by tomorrow evening as he has said. I have a feeling that it is going to take him at least 1 day longer. But we’ll see about that.
After we were done painting the closet doors in the office, I finished some touch up work, while Harry went into the bedroom to pull off the tape. Again there are a number of spots that need some touch up work, but we have come to expect that now. After that I started taping off the accent wall in the bedroom and Harry started painting the trim. We have decided to paint the accent wall in the master bedroom in a very dark red and it looks AWESOME. But it will take at least 1 or 2 more coats of paint until the wall is completely colored. Once it is done it will look amazing. If I could have my way, I would have painted the entire bedroom in the accent color, but Harry said it would be too dark for him.
After we finished that wall we were tired, it had been a long day so we headed back to the rental.
Wednesday, September 16, 2009
Remodeling - Day Eighteen
Today Harry and I got a late start. By 11 am we were done packing up my truck and headed out to our house. While we were on the road our contractor called and asked us to pick up another box of tiles at Lowe’s. So we stopped by Lowe’s and picked up the tiles, then picked up some lunch and headed to our house. By the time we were done with lunch and unpacked the truck it was about 12:30 or so. Our contractor had started framing up the fireplace and we will have to pick out a stain for the wood that goes best together with the hardwood floors. Guess we’ll be stopping by Home Depot this evening again. Our contractor Danny still has some tile work in the Master Bathroom to do but the fireplace needs only grout. Danny picked out the grout for the fireplace, but he asked that Harry and I to pick out the grout for the master bathroom.
The first room Harry and I ended up painting today was the Office. While I taped off the trim Harry was busy painting the walls. We made pretty good progress and were finished with the first coat of paint in the office way earlier than we expected.
After the office we started with the Master Bedroom. Again I started taping off the trim, while Harry started painting the walls. Apparently our master bedroom is larger than the office as it took us a lot longer to finish the first coat of paint. We were done with the master bedroom by 6.30 pm.
After a short break we went back to the office to start with the second coat of paint. The only problem with that was that we were slowly running out of daylight and we had no light in the office. So we took our contractors construction light and started painting the office. Shortly after we had started the second coat in the office we were sweating like we were out in the direct sunlight, as that construction light gives off a ton of heat. But we knew we had to finish the second coat of paint regardless. So this time I painted the majority of the walls while Harry painted the trim.
While painting the office I got a call from Living Spaces informing us that they will be delivering the furniture that we purchased two weeks ago tomorrow between the hours of 9:30am and 11:30am. That put a wrench in our tomorrow plans. Danny asked up to pick up a few finishing things for the house and we had planned to pick them up in the morning before heading up to the house.. but when I say morning I mean around 10am. But now we had to be at the house by 9:30am which meant we would have to leave our rental by 8:30 and be up even earlier.
So we got home from a long day of painting, dropped off the dog and then turned around and went to home depot to pick up some supplies.
We finally go home around 10pm and were exhausted. And tomorrow we will be getting up early to get to the house before the delivery truck.. with our luck the truck with show up right at 9:30am.
The adventure continues....
Tuesday, September 15, 2009
Dinner and a Movie
Tonight I went out and had dinner, at Islands, with my buddy Christopher. It's been a while since we hung out so it was alot of fun catching up on our lives. After dinner we headed to AMC to catch the movie "9"This movie looked interesting so I was happy to hear that Christopher wanted to see it as Harry didn't really have any interest. I won't go into great detail but the movie was good, not great but far from bad. I liked the story it was simple. I did wish they went into more detail about the 9 creatures, why 9 was there any significance? The machine monster were pretty sweet, especially the snake type one... very creepy stuff. This movie had some top notch actors and was animated beautifully. I look forward to watching it again.
Knights of the Guild Podcast Ep 8 pt1
Knights of the Guild Episode 8 Part 1
Show Notes:
Here it is Episode 8 part 1 of Knights of the Guild. We hope you enjoy it.
Today’s show features:
- First up we have our monthly Vorkism.
- Our location today is at Gamestop as we wait in line for the new expansion game The Spiers of Dragonor.
- We talk about Season 3 and have some fan reactions to the first 2 episode that have aired.
- We have some Guild news about the two season box set and the comic book.
- We interview crew member Jay about his experience working on season 2 & 3.

- We find out what the actors and crew are up too.
- We have a special report from Dragon*Con
- We thank our Donors
- Mention important links
- Mention our recent Contest winners
- Then we have our final words and we say goodbye.
Please send your audio or written comments to knightsoftheguild@gmail.com or you can leave your comments in the comment section of this site.
Thank you again for all your support, we do this podcast because we are fans and more importantly for the fans.
Kenny & Jenni
Other Important Links
- Knights of the Guild Feeds/Downloads http://knightsoftheguild.com
- Knights of the Guild Daily Blog http://knightsoftheguildpodcast.blogspot.com/
- Knights of the Guild Fan page on Facebook http://www.facebook.com/group
- Knights of the Guild Group on Watchtheguild.com http://community.watchtheguild.com/group
- Knights of the Guild Livestream Channel http://www.livestream.com/knightsoftheguild
- Follow us on twitter @knightsofguild
- Knights of the Guild Cafe Press Online Shop : Where you can buy KOTG T-shrits, magnets, buttons and so much more. http://www.cafepress.com/KOTG
- Robin on Movie Mobs http://www.reelzchannel.com/moviemob
- Legend of Neil http://www.effinfunny.com/legend-of-neil
- The Guild http://watchtheguild.com
- Geekerdome Network http://geekerdome.com
- Between the Lines Studio Podcast Network http://Betweenthelinesstudio.com
- The Variants http://thevariants.com
- Melts in your pocket http://meltsinyourpocket.com
- The Night is a Child http://www.pasadenaplayhouse.org
- Conquest http://www.youtube.com/Conquestguide
- Sacramentjoe http://sacramentjoe.com
- Memories of the Futurecast http://wilwheaton.typepad.com/books/memories-of-the-future-volume-one/
- Memories of the Futurecast http://wilwheaton.typepad.com/wwdnbackup/2009/09/memories-of-the-futurecast-episode-one.html
Podcast Promo’s played during the show this week:
Monday, September 14, 2009
Remolding - Day Seventeen

Today we got up early, packed up the truck and headed to the house. Once we were done unpacking the truck we went inside house and started to clean the new floor, we did the TV room first and started to lay down brown paper over the work so nothing get's on them. We then cleaned the dining and living room floors and noticed that they still looked white and sure enough it was dust, so we cleaned them for a second time and ran our finger across them and still got dust on it. We think we need a better mop as it's going to take a few more cleaning before we finally get them looking great. We then moved onto painting. While I taped up the rest of the kitchen Harry went into the office and sanded down some spots that he had spackled yesterday. Once he was done with that he went back into the kitchen and started putting a second coat of paint on the window area in the kitchen, while I painted the walls above the ledge. After we had finished that we pulled out the fridge and painted behind the fridge as well. Now the kitchen is completely done !!!
Next on the agenda was the Entrance. After I taped off the walls Harry started painting the remaining wall the same blue accent color that we had used in the dining and living room. While he did this I was busy with some touch up work in the kitchen and started taping off the beams in the living and dining room. After Lunch Harry put a second coat of paint on the accent wall in the Entrance.
Once we were done with that we turned our attention to the 2 beams. While I painted the major surface of the 2 beams with the roller, Harry used the ladder to do the trim. But all our hard work paid off.. we finished painting the living and dining rooms, both hallways, kitchen, pantry, entrance, TV room and Guest Room.
Tomorrow we will be taking a day off, but on Wednesday we’re back painting !!
Sunday, September 13, 2009
Remodeling - Day Sixteen
First thing we did today was head to Home Depot... We had to pick up 15 more boxes of laminate hardwood flooring, 1 can of paint for the living room, paper to protect the hardwood floor, painters tape and some cleaning supplies. We spent another 1100 bucks at Home Depot. Once we were done shopping it dawned on us that we had brought my Jeep instead of Harry's pickup truck. We managed to fit all the stuff we had bought, but it was quite a tight fit. Once we got back home we put all the supplies in Harry's truck and used the remaining space to fill it up with stuff that had to go to the house as well. We got to the house around 2 pm.
Once we had finished unpacking the truck we checked on the progress that our contractor had made. They had managed to get about half of the floor in the dining room done and it was looking AWESOME. We then had a quick bite for lunch and then jumped into painting.
I first taped off the remaining walls in the Kitchen. Once that was done I then started painting the remaining walls above the ledge while Harry started painting the walls around the window in the kitchen. We really like the color and it’s already hard to imagine what the kitchen looked all white. While we were doing that our contractor made a lot of progress with the floor and had sanded down the texture wall in the office.
After finishing up with a few minor touch ups in the kitchen Harry and I went to work in the office. By the time I tapped off the one wall and windows we were only able to get a little bit of paint on the walls as night was falling and there is no light in that room. Danny and his helpers stayed a few hours late so they could finish laying down the laminate hardwood flooring. They got about 99% of it done, still have a few things to complete but it looks great. We now have a beautiful hardwood floor in the TV-Room, living and dining room.
Tomorrow Harry and I are back for more Painting!!! We are sooooo over painting..
I will keep you guys posted on the progress !!
Saturday, September 12, 2009
Remodeling - Day Fifteen
Today Harry and I got an early start. We got up around 8 am and started packing up the truck. After that was done we headed to Home Depot to pick up more paint and a new painting poll, since Harry broke one yesterday. By 10 am we had reached our new house. The first thing we saw was a little out of the ordinary, the garage door was open. So as we got to the front door I asked Danny our contractor if he had opened the door.. he said yes..because he had brought to more worker and they wanted to start working on the hardwood floor, which is in the garage. This was unexpected news as we didn't expect the floors to go down until next week. So we quickly went inside to see the progress.
They had pulled out the carpet in the TV-Room and started laying down the Hardwood Floor. Our contractor had also made some progress in the Office and the Master Bedroom with re-texturing the wall and he had made substantial progress re-tiling the fireplace.
After checking out all the new construction work, Harry and I started putting up a second coat of paint in the Pantry. Once that was done we started painting the kitchen. When we opened the paint can I wasn’t quite sure about the color. This is the color that Harry wanted on the walls. So we put a little of paint on one of the kitchen walls. I looked at it from several different angels and still wasn’t quite sure if I liked the color or not, neither was Harry. When the color finally started to dry we were happy with it. But it's defiantly not your typical kitchen color.
For lunch we ordered pizza from a local pizzeria and expected that what you usually get in LA. There were 2 surprised with that. First one pizza was about 25 bucks and the second surprise was the size of the pizza. That thing was huge. All five of us barely finished one pizza and we had ordered two, so there are plenty of leftovers.
After Lunch Harry and I finished up painting the first coat on the kitchen walls between the counter top and the ledge. Once that was done, we pulled the tape off the pantry and inspected the quality of our paint job. There were a few places where we had to do touch up work. Once that was accomplished we checked the paint job in the kitchen as it was already dry, so we started putting up a second coat of paint. While we were doing that Danny, our contractor started ripping out the tile in the Entrance. By the time Harry and I were finished with the second coat of paint in the kitchen our contractor had almost completed laying down the floor in the Entrance.
After the the contractor had left we pull tape off in the kitchen where we no longer needed it. Not quite sure what happened, but we had to do quite a bit of touch up work. After that we finished the final wall in the dining room (at least the first coat).
15 days of painting and not an end in sight.